Return to Article Details The Modelling and Simulation of 330 KV, 600 MW Shiroro Substation in the DIgSILENT Environment for Integration of Hybrid Solar PV – Hydro System to Improve Power Supply in the Federal Capital Territory (FCT) of Abuja from Shiroro, Nigeria Download Download PDF